Preparing measured terrain…
Open terrain Issuer-reported Interpretation
500 m
Drag to orbit · scroll to zoom · arrow keys supported
TerrainMeasured surfaceSRTM · ~30 m source
ELID037Issuer-reported dataJan. 26, 2026
TraceStraight reconstructionNot full downhole survey
MTPublished interpretationNot mineralization
Audit the claim
Every visual state has a source—or a limitation.
The prototype deliberately stops where the public machine-readable data stops. Company drone topography, downhole survey stations, resource solids and the MT voxel model would be required for an authoritative production reconstruction.
ELID037 assay hierarchy
Click an interval to inspect it in 3D.Intervals are nested and not additive. Reported lengths are downhole; true thicknesses are unknown. CuEq assumptions and formula are defined in the issuer release.
QA & fact-check gate
Prototype evidence snapshot- ✓CRS fixed to WGS84 / UTM Zone 18S
- ✓Collar, azimuth, dip and EOH transcribed from issuer Table 1
- ✓All seven interval lengths reconcile to from/to values
- ✓Downhole length and unknown true thickness disclosed
- ✓2022 resource and 2026 drilling kept temporally separate
- ✓MT presented only through the issuer’s published interpretation
- ✓Terrain source, resolution, tile and checksum recorded
- ✓Reduced-motion, keyboard, mobile and WebGL fallback included
Primary sources
Follow the evidence yourself.
E29-2026-01-26Element 29 Reports Longest and Highest-Grade Intercepts to Date at ElidaELID037 collar, orientation, length, assays, geological section and MT sectionE29-TR-2022NI 43-101 Technical Report — Mineral Resource Estimation of the Elida Porphyry Copper ProjectCurrent public Mineral Resource Estimate basis and historical project coordinate authorityUSGS-SRTM-1ARCSRTM 1 Arc-Second GlobalApproximate 30 m regional terrain surface